business-intent-alignment

Resolve ambiguous business intent into measurable requirements before technical planning.

SKILL.md

GitHub

Purpose

Turn ambiguous business intent into a measurable, contradiction-aware baseline that can be frozen in analysis/<topic>/requirements.md.

Trigger / When to use

Use this skill when:

  • business goals are stated as outcomes, preferences, or urgency without measurable requirements
  • stakeholders disagree, omit constraints, or mix goals with assumed solutions
  • the next workflow step needs a frozen baseline before technical planning or task decomposition
  • the request sounds certain but still hides untested assumptions about users, scale, timing, roles, or failure handling

Do not use this skill when:

  • analysis/<topic>/requirements.md is already frozen and the next task is technical translation; use business-to-technical-translation
  • the task is implementation planning, architecture design, or coding
  • the user wants uncommitted brainstorming without converting it into a requirements baseline

Inputs

  • topic name and intended analysis/<topic>/requirements.md path
  • stated business outcomes, success claims, deadlines, and stakeholder expectations
  • target users, actors, permissions, and environments
  • known constraints, dependencies, compliance rules, and failure consequences
  • any existing notes, tickets, meeting summaries, or prior contradictions

Process

  1. Confirm the task is business-intent alignment rather than technical solutioning or implementation planning.
  2. Adopt a Socratic interviewer posture. Convert every claim into something testable: who needs what outcome, by when, under which conditions, and how success will be observed.
  3. Challenge assumptions directly. Ask hard follow-up questions about actor boundaries, hidden dependencies, incentives, manual work, exception handling, and business loss if the outcome fails.
  4. Run extreme-boundary checks before freezing anything:
    • no network or degraded external dependency
    • wrong user role or missing approval
    • interrupted process or partial completion
    • lowest-volume and peak-volume conditions
    • time-window, audit, or regulatory edge cases
  5. Surface contradictions explicitly. If one statement conflicts with another, record the conflict, force a decision, and do not smooth it over with vague wording.
  6. Force measurability. Rewrite vague words such as fast, simple, accurate, or better into observable thresholds, decision rules, and acceptance signals.
  7. Freeze the resolved baseline into analysis/<topic>/requirements.md with measurable requirements, explicit assumptions, non-goals, surfaced contradictions, and any remaining blockers that must be resolved before technical translation.

Examples

  • Positive: Turn make partner onboarding faster into a baseline that defines actor roles, approval deadlines, measurable completion targets, interruption handling, and explicit contradictions about compliance review timing.
  • Negative: Accept users want a simple dashboard as sufficient, skip edge-case questioning, and move straight to technical design without measurable thresholds or contradiction tracking.

Outputs

  • analysis/<topic>/requirements.md as the business baseline for downstream work
  • measurable requirements with named actors, conditions, thresholds, and acceptance signals
  • explicit assumptions, non-goals, surfaced contradictions, and blocker notes
  • a clear handoff boundary for technical translation

Validation

Required Checks

  • confirm every in-scope requirement names an actor, a condition, an observable outcome, and a metric or decision rule
  • confirm vague adjectives were rewritten into measurable thresholds or explicit decision rules
  • confirm contradictions are surfaced explicitly and either resolved or marked as blockers
  • confirm extreme-boundary checks were applied before freezing the baseline
  • confirm the draft is either frozen for technical translation or explicitly blocked from it

Quality Checks (best effort)

  • confirm the document names assumptions, non-goals, and unresolved decisions clearly enough that downstream technical translation does not need to guess intent
  • confirm acceptance signals are observable by another person, not just implied by stakeholder preference
  • confirm the wording stays in business-language requirements instead of drifting into architecture or implementation design

On Soft Fail

  • mark status as INCOMPLETE
  • continue with the best measurable baseline that can be supported safely
  • list the missing signals, unresolved contradictions, or limitation-driven gaps explicitly

Failure Handling

Missing Context

  • mark output as INCOMPLETE when actor, success criteria, or blocker context is missing
  • list the exact missing business inputs required to freeze the baseline safely

Ambiguous Requirement

  • if competing interpretations would change the frozen baseline, mark status as BLOCKED and force a human decision instead of averaging them together
  • if the ambiguity is narrow and does not change the main baseline, proceed with stated assumptions and list them explicitly

Execution Limitation

  • state the limitation explicitly if you cannot access required stakeholder context or evidence
  • do not fabricate metrics, contradictions, or boundary outcomes to make the baseline look complete

Red Flags

  • the draft repeats stakeholder adjectives without converting them into measurable behavior
  • one stakeholder promise silently cancels another requirement
  • technical implementation ideas appear before the baseline is frozen
  • edge conditions are dismissed as later even though they change the requirement meaning

Common Rationalizations

  • Everyone already knows what fast means.
  • Engineering can figure out the contradictions later.
  • Offline or wrong-role cases are edge cases, not requirement work.
  • If we write enough tickets, the missing business logic will emerge.

Boundaries

  • Do not design system architecture, estimate implementation, or break work into engineering tasks.
  • Do not freeze a baseline by hiding contradictions behind compromise wording.
  • Do not treat stakeholder preference statements as measurable requirements without challenge.
  • Do not replace named actors, thresholds, and failure conditions with generic aspirational language.
  • Do not move into technical solutioning before the business baseline is frozen or explicitly marked as blocked for downstream translation.

Local references

  • reference.md: stable rules for measurability, contradiction surfacing, extreme-boundary checks, and freeze criteria
  • examples.md: detailed Socratic interviewer scenarios, including positive and negative requirement-alignment patterns
  • checklist.md: repeatable freeze-readiness and misuse-prevention checks before declaring the baseline ready for technical translation