Write Decision-Ready Technical Reports

<purpose>

Make a technical report easy to skim, verify, and act on. Preserve detailed evidence, but put a small decision layer before it. A cold reader should be able to identify the current state, recommended action, alternatives, consequences, and unresolved evidence without reconstructing the investigation.

</purpose> <requirements>

P0 requirements

  1. REPORT-REQ001-lead-with-reader-outcome. State the artifact's purpose, audience, current status, scope, evidence date or revision, and decisions needed in the first screen.
  2. REPORT-REQ002-separate-now-history-target. Never mix the reproduced past, verified current state, and selected target. Use explicit Before, Now, and Target labels.
  3. REPORT-REQ003-separate-cause-consequence. Put the technical mechanism and user-visible consequence in different columns. Keep each cell to one claim.
  4. REPORT-REQ004-label-evidence-state. Use a small stable vocabulary such as observed, reproduced, confirmed, selected, implemented, verified, blocked, deferred, rejected, and superseded. Do not use “fixed” for code that has not passed its completion gate.
  5. REPORT-REQ005-make-decisions-answerable. Phrase each decision as a concrete question and include the recommendation, serious alternatives, consequence of each choice, evidence needed, and present decision status.
  6. REPORT-REQ006-name-baselines-and-versions. Identify the relevant commit, package, schema, running process, configuration, dataset, workload, or date. State when source, install, and live process differ.
  7. REPORT-REQ007-preserve-evidence-by-link. Keep reproductions, logs, calculations, and design rationale in a detailed evidence section or companion artifact. Add an overview; do not replace evidence with a lossy summary.
  8. REPORT-REQ008-distinguish-artifact-roles. Say whether a file is an evidence log, decision brief, implementation plan, status report, benchmark report, or handoff. Do not let one file silently act as all six.
  9. REPORT-REQ009-show-before-after-contract. For proposed work, show current behavior, target behavior, user consequence, compatibility or migration effect, and completion proof.
  10. REPORT-REQ010-quantify-with-context. Give every important number a counted thing, unit, baseline, environment or workload, and evidence source. Distinguish measurements from requirements and hypotheses.
  11. REPORT-REQ011-progressively-disclose-detail. Order content as decision dashboard, current truth, options, execution map, then detailed evidence. Introduce terms before using them.
  12. REPORT-REQ012-preserve-complexity-tradeoffs. State relevant time, peak and retained memory, I/O, latency, concurrency, and output-growth effects when a decision can change them.
  13. REPORT-REQ013-separate-input-from-instruction. Distinguish information that should change the report's conclusions from information used to author, execute, or evaluate the reporting method.
  14. REPORT-REQ014-end-with-decidable-next-step. End the decision layer with the exact choice, approval, experiment, or implementation gate needed next.
</requirements> <workflow>

1. Classify the artifact

Choose one primary job:

Artifact Reader's question Required center
Evidence log What happened, and how do we know? Reproduction, environment, observations, ruled-out causes
Decision brief What should we choose? Options, recommendation, consequences, evidence
Implementation plan How will the selected outcome be delivered? Dependencies, tests, work packages, done conditions
Status report What is true now, and what changed? Baseline, current state, deltas, blockers
Benchmark report What changed under the same workload? Before/after measurements, uncertainty, resource effects
Handoff What must the next maintainer know or do? Current truth, exact state, risks, first action

If one file must serve several jobs, label the sections and declare which section has current authority.

2. Build the decision dashboard

Start with these compact tables, omitting only rows that do not apply.

Field Answer
Purpose One sentence
Current status One precise state
Evidence baseline Date, revision, environment, or workload
In scope Bounded surfaces or components
Out of scope Nearby work not authorized or not selected
Decision needed Exact answerable question, or none

Then show the smallest useful state transition:

Area Before or reproduced issue Now Target User consequence
One capability Prior behavior Verified current behavior Selected behavior Why the difference matters

Do not repeat the same facts in both tables.

3. Make decisions explicit

Use one row per independent choice:

ID Decision question Recommendation Serious alternative Consequence Status or closing evidence
DEC-1 A concrete question Selected mechanism Keep current or another viable design User and system effect Ready, blocked, or evidence required

Separate a prerequisite experiment from the decision it informs. If no decision remains, say so and identify the implementation gate instead.

4. Map execution without hiding tradeoffs

For each accepted work package, use:

  • Where: authoritative owner and affected adapters.
  • Current: verified behavior, not stale plan text.
  • Target: exact externally visible and internal contract.
  • Why: user consequence and architectural rationale.
  • Tests first: smallest failing reproduction and cross-surface regressions.
  • Complexity: present and target time, memory, I/O, latency, concurrency, and output bounds.
  • Compatibility: migration, versioning, default, and rollback effects.
  • Done when: observable completion gate.
  • Dependencies: prior decisions, work packages, or external action.

5. Streamline and verify

  1. Remove repeated conclusions while retaining unique evidence.
  2. Split cause from consequence and current state from interpretation.
  3. Keep tables narrow; move multi-paragraph reasoning below the table.
  4. Use bold sparingly for the user-visible impact or selected choice.
  5. Check every status word against its proof.
  6. Ask a cold reader to answer: What is true now? What changes? Why? What can I decide? What remains uncertain? Where is the proof?
  7. If any answer requires scanning the detailed evidence, repair the dashboard.
</workflow> <output_contract>

Deliver a report whose first section is sufficient to make the named decision and whose later sections are sufficient to audit it. Include:

  • a document contract and evidence baseline;
  • a Before / Now / Target / consequence view;
  • an explicit decision register or the statement No decision remains;
  • an implementation or verification map;
  • links to preserved evidence;
  • precise next action.

Do not present a roadmap as current status, a hypothesis as a defect, implementation as verification, a shortened view as complete evidence, or a large table as a substitute for a decision.

</output_contract>