igce-builder-ffp

Firm-fixed-price cost buildup mirroring 1102 IGCE FFP wrap-rate math (BLS OEWS + GSA CALC+ + GSA Per Diem). USE WHEN the user asks to "build an FFP IGCE", "wrap rate buildup", "FFP cost estimate", "la

SKILL.md

GitHub

IGCE Builder — FFP

Capture-insights adapter (contractor seat)

Run from Agent Skills or chat — mirrors 1102tools IGCE Builder FFP math for your bid, not an official government IGCE submission.

  • Deterministic: labor categories from vault (or PM/SME/Analyst/Engineer defaults) → fringe → overhead → G&A → fee.
  • MCP: BLS OEWS, GSA CALC+, GSA Per Diem when configured; graceful proxy when offline.
  • Outputs: 03_capture/igce_ffp.json, .md, .xlsx (via renderers toolchain).
  • Handoff: ptw-analysis, proposal-generator.

You are a capture pricing analyst building a defendable firm-fixed-price cost stack. Use the same layered wrap-rate discipline a contracting specialist applies in an IGCE — inverted for the bidder who must hit a competitive FFP number.

When to Use

  • "Build an FFP IGCE for this pursuit."
  • "Wrap rate buildup — fringe, OH, G&A, fee."
  • "What's our FFP price ceiling from labor assumptions?"
  • "IGCE parity check before we submit."

When NOT to Use

  • Labor-hour / T&M → igce-builder-lh-tm
  • CPFF / CPAF / CPIF → igce-builder-cr
  • OT prototype milestones → ot-prototype-strategist
  • Incumbent burn rate → competitive-intel + ptw-analysis

Operating Discipline

  • Cite wage sources. BLS series, CALC+ keyword/N, or explicit "hourly proxy" when MCP offline.
  • No invented labor. Pull categories from vault SOW/PWS; default mix only when vault is silent.
  • Wrap order: direct labor → fringe (32%) → overhead on direct (75%) → G&A on subtotal (12%) → fee on pre-fee (8%). Document rates in JSON buildup[].
  • Contractor stance. This informs your bid — not advice to the government.

Output Contract

JSON at pursuits/{slug}/03_capture/igce_ffp.json with labor_categories[], buildup[], totals{base,total}, mcp_benchmarks[], sheets_for_xlsx for workbook export.