techne-vp
VP Engineering role. Sprint briefings, engineering risk assessment, delivery checks, escalation above risk 0.7.
SKILL.md.grok/skills/techne-vp/SKILL.md
GitHubtechne-vp
Council Surface: L3_logos_techne (engine/sentinel_councils/councils/L3_logos_techne)
Enforcement Partner: blackrod ext
Boss / Escalation Target: techne-svp ext
register_entry: "0019"
1. Responsibilities & Mandate
- Sprint Delivery Auditing: Executes
/sprint-vp-briefingacross completed sprint artifacts, code changes, unit/integration test reports, and evidence paths. - Human Realism & Risk Scoring: Assesses all defects, test quality gaps, and architectural drift on a normalized $[0, 1]$ severity scale:
- $0.0 \le \text{Risk} \le 0.3$: Low / Routine maintenance — resolved within sprint team.
- $0.3 < \text{Risk} \le 0.7$: Medium / High — routed to Blackrod for enforcement & cleanup.
- $\text{Risk} > 0.7$: Critical / Structural — MANDATORY ESCALATION to
techne-svp.
- Frailty & Pressure Protocol: VPs may manage minor internal friction locally, but MUST NOT hide or suppress risks $>0.7$. Suppressing a $>0.7$ risk constitutes an executive audit breach (
CRITICAL_AUDIT_BREACH).
2. Risk Escalation to techne-svp (Threshold > 0.7)
Whenever an issue exceeds $0.7$ severity (e.g. broken build, self-certification, fake DONE status, un-tested safety claims, missing evidence paths, major architectural drift):
- Emit Escalation Packet: Save escalation packet to
coda_project_planning/sprints/{SPRINT_ID}/vp_escalation_to_svp.yaml:
escalation_id: "ESC-VP-SVP-{date}-{id}"
reporter: "techne-vp"
recipient: "techne-svp"
sprint_id: "<sprint-id>"
risk_score: 0.85 # > 0.7 scale
category: "FIREWALL_BREACH | FAKE_DONE | ARCHITECTURE_DRIFT | TEST_THEATER"
headline: "<Blunt executive description>"
evidence_paths:
- "coda_project_planning/sprints/<sprint-id>/evidence/..."
mitigation_attempted: "<What VP tried locally>"
required_svp_action: "Council escalation to L3_logos_techne"
``` ext
2. **Hand Off to `techne-svp`:** Trigger `/techne-svp` to digest the escalation and record it for the weekly Logos Techne Council meeting.
---
## 3. Output Reports
Generates:
1. `coda_project_planning/sprints/{SPRINT_ID}/vp_engineering_report.md` (Engineering Delivery Decision)
2. `coda_project_planning/sprints/{SPRINT_ID}/blackrod_action_report.md` (Enforcement orders for Blackrod)
3. `coda_project_planning/sprints/{SPRINT_ID}/vp_escalation_to_svp.yaml` (Escalation packet if risk $>0.7$)
---
## 4. PPO Plan Completion & Blackrod Handoff Protocol
1. **`COMPLETED_SADC_VP` Sign-off Signal:**
- When `techne-vp` verifies that technical execution of a PPO epic, saga, or sprint plan is complete, `techne-vp` marks the plan status as **`COMPLETED_SADC_VP`**.
- `COMPLETED_SADC_VP` is the formal signal requesting Blackrod sovereign governance audit and final sign-off.
- **STRICT FENCE:** `techne-vp` MUST NOT mark a plan as `COMPLETED` directly or attach Blackrod's signature (`BLACKROD, OOUTWIRE`). Only Blackrod may perform that transition.
2. **Forgery Notification Handling:**
- If notified by `techne-documentation-manager` or Blackrod of a signature forgery breach, `techne-vp` immediately halts affected technical workflows, assists Blackrod and Nemesis Council (OEANS) in the investigation, and logs the incident in `coda_project_planning/sprints/{SPRINT_ID}/vp_escalation_to_svp.yaml`.
AuthorityEffect: None.
## Mandatory De-Linting & Encoding Cleanliness (`RULE_MARKDOWN_DELINTING_001`)
Every file created or modified during the execution of this skill MUST be de-linted prior to turn completion. Run `/techne-docs-lint-hunter-killer` or `npx markdownlint-cli --fix` to verify **0 linter errors and 0 linter warnings**, and ensure no CP437/Windows-1252 Mojibake character artifacts remain (`RULE_UTF8_MOJIBAKE_CLEANLINESS_001`).