risk-officer
Use when surfacing and prioritising risk before commit — blast-radius framing, mitigations, residual-risk verdict — even if the user just says 'what could go wrong here?'.
SKILL.mdsrc/skills/risk-officer/SKILL.md
GitHubrisk-officer
Surface risks the implementer or PO is likely to underweight, score them by likelihood × impact, and propose mitigations the team can actually execute. Sibling of
threat-modeling(security-only) andblast-radius-analyzer(call-site only) — this skill takes the wider product, ops, and coordination view.
When to use
- Pre-implementation: a roadmap, ADR, or refined ticket needs a risk pass before the team commits.
- Pre-merge: a non-trivial diff is about to land and the team wants one more risk lens beyond the four standard judges.
- Post-incident: surface the risks the team should track to prevent recurrence (without writing the post-mortem itself).
- German triggers: "was kann schiefgehen?", "Risiko-Check", "wo brennt es?".
Do NOT use when:
- The concern is exclusively security or authZ — route to
threat-modelingorjudge-security-auditor. - The concern is exclusively call-site impact of a refactor — route
to
blast-radius-analyzer. - The user wants a fix, not a risk view — risk-officer never patches.
Procedure
1. Inspect the change
Read the input (roadmap step, ticket, diff, post-mortem) and identify the scope in one sentence: "This change does X for users Y, touching systems Z." If you cannot, the artefact is not reviewable — stop and ask.
2. Enumerate risks across five lenses
| Lens | Sample questions |
|---|---|
| Product | Wrong outcome shipped, churn, support load, brand impact |
| Operations | Rollback path, observability, on-call burden, alert noise |
| Coordination | Cross-team dependencies, communication gaps, sequencing |
| Data | Loss, corruption, leakage, retention, compliance, residency |
| Time | Schedule slip, opportunity cost, sunk-cost lock-in |
Per lens, list each risk as a single bullet. Reject vague risks — "could break things" is not a risk; "queue worker silently drops messages on retry exhaustion" is.
3. Score each risk
For every risk, assign L (likelihood: low / med / high) and I
(impact: low / med / high). Top-5 sort by LxI rank; cite the
trigger condition for each L and I. Do NOT pad to a fixed count —
three sharp risks beat ten generic ones.
4. Propose mitigations
For the top-5 risks, propose one mitigation that the team can
own. Each mitigation has an owner role (eng, ops, PO, support), a
rough size (S / M / L), and a residual-risk note (what stays after
mitigation). Mitigations the team cannot execute are not mitigations
— flag them as accept or escalate.
5. Issue a verdict
| Verdict | When to issue |
|---|---|
proceed |
Top-5 risks have owned mitigations; residual is acceptable |
proceed-with-mitigations |
Mitigations must land BEFORE or WITH the change |
pause |
One or more high × high risks have no executable mitigation |
pause is not a veto — it forces the user to decide explicitly.
6. Validate the verdict
Before emitting, verify each top-5 risk has: a concrete trigger, a
scored L×I, an owned mitigation (or explicit accept), and a
residual note. Ensure the verdict matches the worst residual — a
high × high residual without executable mitigation must produce
pause, not proceed.
Output format
The report is a single block with these ordered fields:
Target:— one-sentence scope from step 1Top-5 risks:— numbered list, each withL=,I=, trigger, mitigation, owner, size, residualOther risks tracked:— count of risks below the top-5 cutVerdict:— exactly one ofproceed/proceed-with-mitigations/pause
Risk-Officer
Target: <one-sentence scope>
Top-5 risks:
1. 🔴 <risk> (L=high, I=high) Trigger: <condition>
Mitigation: <action> Owner: <role> Size: <S/M/L>
Residual: <what remains>
2. 🟡 <risk> (L=med, I=high) ...
Other risks tracked: <count>, summarised below or omitted if low/low.
Verdict: proceed | proceed-with-mitigations | pause
Gotcha
- A risk without a trigger is a vibe, not a risk. Reject vibes.
- Likelihood is conditional on the change — not the universal base rate of the system. "Postgres goes down" is not a risk of this change unless the change increases that likelihood.
- Mitigations the team will not execute are theatre. Be honest in the residual-risk note.
Do NOT
- Do NOT enumerate every conceivable risk — top-5 with rationale is the contract.
- Do NOT score
high × highreflexively to be cautious; mis-scoring destroys the rank. - Do NOT propose mitigations the agent itself will own — the owner is always a human role.
- Do NOT issue
pauseas a soft veto on something the user already decided; issueproceed-with-mitigationsand surface the residual.