auto-continue

Auto-continue through todos with idle detection and safety gates. Use for multi-step orchestration.

SKILL.md

GitHub

Auto-Continue Mode

Disciplined automatic continuation through multi-step tasks. Eliminates unnecessary pauses while preserving mandatory safety gates.


Core Principle

Auto-continue through unambiguous work. Stop only at real decision points.


Mandatory Gates (ALWAYS STOP)

Gate Trigger What happens
GATE 0 β€” Agora Gate Agora outputs AWAITING_APPROVAL OR ## πŸ›οΈ Agora Council synthesis block appears HARD STOP. Do not call any tool, do not continue any todo, do not suggest next steps. Wait for user to type: APPROVE / REQUEST CHANGES / DISCARD. "ok", "yes", "sure", "continue" are NOT valid.
GATE 1 β€” Plan Approval Athena generates a plan User confirms scope before code is written
GATE 2 β€” Phase Review Themis reviews implementation User sees changes before next phase
GATE 3 β€” Git Commit After each phase is approved User controls git history; no auto-commit

Agora is always GATE 0: any response containing AWAITING_APPROVAL or a ## πŸ›οΈ Agora Council block overrides all auto-continue rules.


Auto-Continue Rules

Continue automatically when:

  • Next todo is a direct consequence of the current one
  • Action is reversible (file edits, tests, linting)
  • Scope is within the approved plan
  • No new ambiguity has emerged

Stop and ask when:

  • A todo requires a decision not covered by the plan
  • An unexpected error changes the approach
  • A dependency is missing or broken
  • A task would exceed remaining steps budget


Implementation Pattern

1. Create todos for all steps at start
2. Mark first todo in_progress
3. Complete work β†’ mark completed immediately
4. Mark next todo in_progress β†’ repeat
5. Do NOT ask "should I continue?" between clear steps
6. Stop at Gate 1, 2, or 3
7. After gate approval, resume with next todo

Never batch-complete todos. Mark each completed as soon as done.


Safety Checks Before Continuing

  • Previous step completed successfully (tests pass, no errors)
  • Next step is within approved plan scope
  • No new blocking issues emerged
  • steps counter has sufficient budget remaining

Cooldown Pattern

Between phases, execute a brief synthesis handoff to prevent context drift and prepare the next phase:

Phase Summary Template

Phase N complete. Summary:
- What was done: <2 bullet points>
- What changed: <files modified>
- What's next: <Gate 2 review OR next phase>
- Will continue: <YES / after gate approval>

Cooldown Rules

  1. Between parallel waves (no dependency): No cooldown needed β€” wave results are independent
  2. Between sequential waves (with dependency): Always run cooldown β€” dependencies may have changed context
  3. After Themis review (GATE 2): Cooldown is mandatory β€” review findings may change the plan
  4. Session reuse check: Before starting next phase, check if a specialist session from a previous phase can be reused (see session-goal skill)

Abbreviated Cooldown

When auto-continuing between sequential non-gated phases, the cooldown is abbreviated to one line:

β†’ Phase N done. Next: Phase N+1. [auto-continuing]

Only expand to full cooldown when hitting a mandatory gate.


Timeout & Retry Enforcement

When a delegated agent does not respond in time, enforce the timeout policy from routing.yml.

Behavior by Agent Role

Agent Role Timeout Retry Policy Fallback Timeout Parcial?
Explorer (apollo) 60s 2 retries, exponential backoff athena βœ… Yes β€” partial results OK
Implementer (hermes, aphrodite) 180s 3 retries, exponential backoff talos ❌ No β€” must produce artifact
Reviewer (themis) 120s 2 retries, exponential backoff zeus ❌ No β€” must produce verdict
Infrastructure (prometheus) 300s 2 retries, exponential backoff hermes ❌ No
Hotfix (talos) 30s 1 retry, no backoff hermes βœ… Yes β€” one-liner fix OK

Timeout Parcial (Partial Results)

Timeout parcial is only allowed for read-only, independent agents:

  • βœ… @apollo (codebase search) β€” can return partial file list
  • βœ… @gaia (literature review) β€” can return partial findings
  • βœ… @talos (hotfix confirmation) β€” can return without fix if timeout
  • ❌ Never for implementers (@hermes, @aphrodite, @demeter) β€” must complete or fail
  • ❌ Never for reviewers (@themis) β€” must produce a verdict

How to signal timeout parcial: When dispatching, set the expectation explicitly:

@apollo Search for all auth-related files. If you hit timeout, return whatever you have found so far β€” partial results are acceptable.

Timeout Tracking Table

Maintain a mental table of in-flight delegations:

Agent Started Timeout Status Partial OK?
apollo T+0s T+60s βœ… complete βœ…
hermes T+0s T+180s ⏳ in progress ❌

Examples

Good (auto-continues):

βœ… Wrote migration file.
β†’ Running migration tests...
βœ… Tests pass (3/3).
β†’ Next: write UserRepository query methods.

Good (stops at Gate 2):

βœ… Phase 1 complete: migration + repository layer.
⏸️ GATE 2 β€” Themis review summary:
  - Coverage: 87% βœ… | No OWASP issues βœ…
Ready for Phase 2? Waiting for go-ahead.

Bad (stops unnecessarily):

βœ… Wrote the migration file.
Should I now run the migration tests? [waiting]

Session Heartbeat

Auto-save checkpoint every N turns (configurable, default 5).

Heartbeat File

.pantheon/deepwork/<slug>/heartbeat.json

Heartbeat JSON Format

{
  "slug": "task-identifier",
  "last_action": "2026-07-16T20:00:00Z",
  "turn_count": 10,
  "current_phase": 2,
  "status": "alive | warning | stalled | paused | completed",
  "next_action": "brief description of next planned action"
}

Heartbeat Rules

  1. Update every 5 turns minimum (by default)
  2. Contains NO context β€” only timestamps and counters
  3. Single file, always overwritten (not versioned)
  4. Used for quick "is this session alive?" checks

Checkpoint Persistence

Checkpoint File Structure

Each deepwork task maintains:

.pantheon/deepwork/<slug>/
β”œβ”€β”€ PLAN.md                 # Immutable plan (created at start)
β”œβ”€β”€ STATUS.md               # Human-readable current state (updated every phase)
β”œβ”€β”€ heartbeat.json          # Lightweight ping (updated every N turns)
β”œβ”€β”€ checkpoint-<N>.json     # Full state snapshot (created at phase boundaries)
β”œβ”€β”€ session.json            # Session metadata (created at start, updated on stop)
└── REVIEW.md               # Final Themis review (created at end)

Checkpoint JSON Schema

{
  "slug": "string β€” unique task identifier",
  "phase": "integer β€” current phase number",
  "turn_count": "integer β€” total turns elapsed",
  "timestamp": "string β€” ISO 8601 timestamp",
  "context_hash": "string β€” first 8 hex chars of SHA-256 of STATUS.md",
  "version": "integer β€” schema version (current: 2)"
}

Checkpoint Rules

  1. Save at every phase boundary AND before any delegate dispatch
  2. Numbered sequentially (checkpoint-1.json, checkpoint-2.json, …)
  3. Keep last 10 checkpoints; archive older ones
  4. On resume: read the highest-numbered checkpoint for full state

Safety Policy Configuration

Configurable gates for different platforms and risk levels:

Gate Default Auto-Approval Condition
GATE 0 β€” Council/Plan Always Ask N/A β€” always requires human
GATE 1 β€” Plan Approval Always Ask Plan matches acceptance criteria + no risks flagged
GATE 2 β€” Themis Review Ask by Default Auto-approve if: Themis APPROVED + no CRITICAL/HIGH issues + coverage β‰₯80%
GATE 3 β€” Git Commit Never Auto N/A β€” always manual
Deploy Always Ask N/A β€” always requires human
Destructive DB Ops Always Ask N/A β€” always requires human

Configuration Format (for agents/PLAN.md)

auto-continue:
  checkpoint_interval: 5     # turns between checkpoints
  idle_warning: 60           # seconds before warning
  idle_stall: 120            # seconds before stall detection
  idle_pause: 300            # seconds before auto-pause
  gates:
    plan_approval: always_ask
    themis_review: auto_approve_if_clean
    git_commit: never_auto
    deploy: always_ask
    destructive_ops: always_ask

Idle Detection

Condition Action
No tool call for 60s Log warning heartbeat (status: warning)
No tool call for 120s Trigger anti-stall protocol
No tool call for 300s Auto-save checkpoint and pause session
Resume User must acknowledge and restart

Scope

Applies to: Zeus (multi-phase), Hermes/Aphrodite/Demeter (TDD cycles), Apollo (parallel searches), Talos (bug fixes).

Does NOT apply to: Athena planning (always presents plan = Gate 1), Iris (confirms before push), destructive operations (always ask).