Scope Management

Overview

Scope is defended by what you write DOWN, especially the "out of scope" line. Undocumented scope drifts; a task whose AC quietly grows mid-flight is the classic cause of a blown estimate and a bounced UAT.

Core principle: Name the boundary explicitly. New scope becomes a new task, never an edit to an in-progress one.

For every feature, write

  • In scope: concrete deliverables in this iteration.
  • Out of scope: explicitly named items deferred or excluded — this line does the real work.
  • Assumptions: constraints treated as given.

TaskTrooper has no epic. For a single direct task, this lives in its own description. For a feature that spans several tasks via analiz, it lives on the analiz task (description or add_task_document) — never re-written per implementation task.

Mid-flight expansion

When a request grows while work is in progress: create a new task for the expansion. Do NOT edit the AC of an in-progress task — a moving target invalidates the developer's plan and QA's scenarios and silently inflates the estimate.

Except when the human changes the task themselves. A comment the task's owner writes ON the task ("also show the logos in the marquee"), or their own edit of its description or criteria, is not mid-flight expansion to push back on — it is the task's requirement now. It outranks the original description and its out-of-scope list; every role builds, reviews, tests and accepts against it. Do not split it into a new task or treat it as creep unless the human asks for that.

MoSCoW inside a feature

Must → this task's acceptance_criteria. Should/Could → separate backlog tasks, never folded into this one. Won't → the Out of scope line, with a reason (see backlog-prioritization).

Dropping a criterion deliberately

Use cancel_criterion with a reason when a criterion is descoped, superseded by a later human comment, or moved to another task — never to get past work that simply wasn't done. cancel_criterion says "we're not shipping this here," which is a scope decision; a rejected review_criterion says "this doesn't work yet," which is a defect. Don't use one for the other.

A new idea found during UAT

Something the PM or QA notices in pm_uat/human_uat that nobody asked for is a candidate for a new backlog task (create_board_task, priority low, same repository/project) — it is never a gap on the current task and never blocks its approval. Only something that breaks a criterion, a human comment, or the original request is a gap.

Worked Example

Feature: "task export."

  • In scope: CSV export of a project's tasks via the board UI.
  • Out of scope: PDF export, scheduled/emailed exports, custom column selection.
  • Assumptions: export is on-demand; ≤ 10k tasks per project.

Mid-sprint the stakeholder says "also email it weekly." That's the out-of-scope "scheduled export" — create a new task for it, keep the in-progress CSV task untouched, and tell the stakeholder it's queued separately.

Common Mistakes

  • Omitting the "out of scope" line → scope creeps by default.
  • Editing an in-progress task's AC to absorb new asks.
  • "We'll figure out scope later" → later is a UAT surprise.

Red Flags

  • A feature with an in-scope list but no out-of-scope list.
  • An in-progress task whose AC changed after work started.