story-done

End-of-story review: verify acceptance criteria, check GDD/ADR deviations, update status to Complete, surface next story.

SKILL.md

GitHub

Story Done

Closes loop between design and implementation. Verifies acceptance criteria, checks GDD/ADR deviations, prompts code review, updates status. Output: updated story (Status: Complete) + next story.

Phase 1: Find Story

Resolve review mode: --review arg → production/review-mode.txt → default lean. Story source: arg path → .arcane/session-state/active.md → most recent sprint file (IN PROGRESS stories) → AskUserQuestion.

Phase 2: Read Story

Extract: name/ID, TR-IDs, manifest version, ADR refs, acceptance criteria, implementation files, story type, engine notes, DoD, estimate. Also read: tr-registry.yaml (current requirement text by TR-ID), referenced GDD section (AC + key rules), referenced ADR (Decision + Consequences), control-manifest.md (current manifest version).

Phase 3: Verify Acceptance Criteria

Auto-verification: file existence (Glob), test pass (Bash), no hardcoded values/strings (Grep), dependency existence.

Manual verification (AskUserQuestion, batch up to 4): subjective qualities, gameplay behavior, performance criteria. Options: "Yes — passes" / "No — fails" / "Not tested yet".

Unverifiable: mark DEFERRED — requires playtest session.

→ Read references/test-evidence-traceability.md for test-criterion mapping rules and evidence requirements by story type

A story whose evidence is a manual record (visual, feel, UI) gets it written from .claude/docs/templates/test-evidence.md.

Phase 4: Check Deviations

  1. GDD rules: current TR requirement text from registry vs implementation (Grep key names)
  2. Manifest staleness: story version vs current manifest version → ADVISORY if older
  3. ADR constraints: forbidden patterns from manifest, grep implementation
  4. Hardcoded values: numeric literals in gameplay logic
  5. Scope: files touched outside story's stated scope

Categories: BLOCKING (contradicts GDD/ADR), ADVISORY (slight drift), OUT OF SCOPE (extra files).

→ Read references/review-gates.md for QA Coverage Gate (Phase 4b) and Code Review Gate (Phase 5) details

Phase 6: Completion Report

Present before updating files:

  • AC status: X/Y passing (auto-verified/confirmed/FAILS/DEFERRED)
  • Test-criterion traceability table
  • Test evidence: type, required, found (YES path / NO BLOCKING / NO ADVISORY)
  • Deviations (BLOCKING/ADVISORY)
  • Scope (within/extra files)
  • Verdict: COMPLETE / COMPLETE WITH NOTES / BLOCKED

BLOCKED → do not proceed, list fixes, offer help.

Phase 7: Update Story

Ask approval → edit story: Status: Complete + ## Completion Notes (date, criteria, deviations, test evidence, code review status). Advisory deviations → offer to log in docs/tech-debt-register.md. Update production/sprint-status.yaml if exists. Append to .arcane/session-state/active.md.

Phase 8: Surface Next Story

Read sprint plan → find READY/NOT STARTED stories (not blocked, Must/Should Have). Present up to 3 options. If all Must Have complete → sprint close-out sequence: /smoke-check sprint → /gate-check.

Protocol

  • Never mark complete without user approval
  • Never auto-fix failing criteria — report and ask
  • Deviations are facts, not judgments — user decides
  • BLOCKED verdict is advisory — user can override (document risk)